|
GRCA monitoring network - Lower Grand River
Caution: Data is provisional. For more information read our
Data Terms of Use

Interpreting the lines
The numbers on the left of the graph will change depending on the flows in the last
seven days. Here are some significant flow rates to help you interpret current
conditions.
- Learn how ice jams can cause sudden changes in the flow rates and lead to flooding.
| Gauge |
Community |
Flow |
|
Significance |
| Galt |
Cambridge |
15 |
|
Normal summer low flow |
| |
(Galt) |
400 |
|
Water at river banks, flooding in low-lying areas |
| |
|
638 |
|
Water St (Hwy. 24) closed south of Ainslie St. |
| |
|
1,050 |
|
Concession St. bridge closed |
| |
|
1,472 |
|
Main St. bridge closed |
| |
|
1,550 |
|
1974 flood |
| |
|
1,628 |
|
Parkhill St. bridge closed |
| |
|
2,352 |
|
Dike capacity |
| |
|
|
|
|
| |
|
|
|
|
| Canning |
|
|
|
Go to Nith River chart |
| |
|
|
|
|
| |
|
|
|
|
| Brantford |
Brantford |
20 |
|
Normal summer low flow |
| |
|
400 |
|
Water at river banks, flooding in low-lying areas |
| |
|
600 |
|
Gilkison St. closed |
| |
|
1,800 |
|
1974 flood |
| |
|
3,400 |
|
Dike capacity |
| |
|
|
|
|
|
|
Caledonia |
400 |
|
Water at river banks, flooding in low-lying areas |
| |
|
1,040 |
|
Caledonia Arena floods |
| |
|
1,800 |
|
1974 flood |
| |
|
|
|
|
| |
Six Nations |
550 |
|
4th Line floods |
| |
|
|
|
|
| |
|
|
|
|
| York |
York |
22 |
|
Normal summer low flow |
| |
|
300 |
|
Water at river banks, flooding in low-lying areas |
| |
|
|
|
|
|
|
Cayuga |
300 |
|
Water at river banks, flooding in low-lying areas |
|
|
|
300 |
|
Campground flooding along Lower Grand |
| |
|
600 |
|
Grand Sports Road floods |
| |
|
1,800 |
|
1974 flood |
| |
|
|
|
|
| |
|
|
|
|
| Dunnville Dam |
Dunnville |
300 |
|
Water
at river banks, flooding in low-lying areas |
| |
|
900 |
|
Some backyards flooded |
| |
|
1,800 |
|
1974 flood |
| |
|
|
|
|
How to read this graph
This graph contains information on flows
in the Grand River during the last week at
various gauge locations. The graph is
automatically updated every hour.
Along the bottom (x axis) are the days
the data was recorded. The vertical line
above the date represents midnight.
Along the left (y axis) is the river flow
measured in cubic metres per second (m3/s).
That shows the amount of water passing by
the gauge at that time. A cubic metre is
1,000 litres of water so a flow of 10 m3/s
would represent 10,000 litres of water per
second.
Please note: A number of factors
will influence the accuracy of the data
including:
- backwater from ice, weeds or debris,
- malfunctioning equipment and/or
routine maintenance of equipment may
cause data spikes, and
- sediment accumulation which may plug
the gauge intake.
For more information read our
Data Terms of Use
Location of Flow Gauges in the Lower Grand River Watershed
|